| |
|
CAMBRIDGE
CAMPUS
K-12 Campus New Construction
Cambridge, Ohio
Client: Cambridge
City Schools
Total Area: HS:
143,620 S.F.; MS: 88,688 S.F.; ES: 64,617 S.F.
Total Cost: $38,022,868
Through a series
of community-based planning meetings, the architects captured the community's
ideas and desires. The community expressed a desire to create a campus
atmosphere, while placing specific grades in separate buildings. Unlike
college campuses, where students travel between buildings, the Cambridge
Campus incorporates an elementary school building, a middle school building,
and a high school building on one site while maintaining separate grade
groupings.
The three buildings preserve a campus harmony through the use of similar
materials, fenestration, and architectural elements. To prepare for
future growth and needs, the site allows for additions, such as space
for a high school auditorium.
Upon entering the 150-acre site, the high school is the most prominent
feature, focusing on the central, two-story media center. Each school
can be viewed as the site winds back, integrating students with a sense
of community to their present, past and future schools. Because the
elementary school is at the back of the site, its secondary entrance
aids in traffic flow and envelops a neighborhood atmosphere with the
adjacent residential subdivision.
The high school's central auditeria will provide a spacious area for
school and community musical and theatrical performances, as well as
student dining. Due to the school's extensive music education program,
a comprehensive music suite will be located adjacent to the auditeria
stage for easy access during performances. The auditeria, new gymnasium,
and full-scale science labs are all direct responses to community input
for the high school.
NEXT
PROJECT >
|
 |
      
TRIAD
ARCHITECTS LTD
784 MORRISON RD, SUITE B
COLUMBUS, OHIO 43230
USA
T
614 751 1833
F 614 751 8018

|