The 2.4 million
dollar addition to the Fairfield Career Center more than addresses an
increasing student population and new educational programs. The innovative
design also transforms the career center's image and serves as a new
marketing tool for the district.
The new front façade was designed to be the dominant feature.
The tower element serves as the signature of the building and directs
visitors and students to the entrance. Once inside, the entryway opens
up to an arched ceiling with clerestory windows. Structural steel beams
and pendant lighting further enhance the space.
The addition houses new science labs, a computer support technology
lab, an HVAC lab, and new adult education spaces. All of these spaces
were designed to support evolving educational technology while keeping
an eye toward the future and wireless technology. A high-tech image
was developed through a dynamic combination of exposed ceilings, pendant
light fixtures, and translucent paneling Kalwall.