CAMBRIDGE CAMPUS
K-12 Campus
New Construction
Cambridge, Ohio

Client: Cambridge City Schools

Total Area:
High School: 143,620 S.F.
Middle School: 88,688 S.F.
Elementary School: 64,617 S.F.


Total Cost: $38,022,868

Through a series of community-based planning meetings, the architects captured the community's ideas and desires. The community expressed a desire to create a campus atmosphere, while placing specific grades in separate buildings. Unlike college campuses, where students travel between buildings, the Cambridge Campus incorporates an elementary school building, a middle school building, and a high school building on one site while maintaining separate grade groupings.

The three buildings preserve a campus harmony through the use of similar materials, fenestration, and architectural elements. To prepare for future growth and needs, the site allows for additions, such as space for a high school auditorium.

Upon entering the 150-acre site, the high school is the most prominent feature, focusing on the central, two-story media center. Each school can be viewed as the site winds back, integrating students with a sense of community to their present, past and future schools. Because the elementary school is at the back of the site, its secondary entrance aids in traffic flow and envelops a neighborhood atmosphere with the adjacent residential subdivision.

The high school's central auditeria will provide a spacious area for school and community musical and theatrical performances, as well as student dining. Due to the school's extensive music education program, a comprehensive music suite will be located adjacent to the auditeria stage for easy access during performances. The auditeria, new gymnasium, and full-scale science labs are all direct responses to community input for the high school.

Home Page

TRIAD ARCHITECTS LTD
936 EASTWIND DRIVE, SUITE 202
COLUMBUS, OHIO 43081
USA

T 614 942 1050
F 614 942 1059

main@triadarchitects.com

HOME | EDUCATION | SITE MAP
    © 1997-2011 TRIAD ARCHITECTS LTD